Plantica

Review the pipe layout before installation.

A process engineering workflow reviewing tanks, pumps, valves and pipe routing together.

GEMAK · Liquid-food processesWorkflow example
Request a demo →
GEMAK · Liquid-food processes — A process engineering workflow reviewing tanks, pumps, valves and pipe routing together.
Facility layout.

What question are we resolving?

Reviewing a pipe route in isolation can hide the surrounding equipment and access constraints. A revision decision needs both connections and physical arrangement in view.

What to bring

Process-area CAD, existing facility geometry and the pipe route to review.

The workflow

  1. Align the references

    Bring equipment and piping into shared facility coordinates. Establish the review area and the revision under discussion.

  2. Locate the issue

    Review pipes, structure and equipment together. Identify the interference and the elements it affects.

  3. Review the revision

    Discuss the alternative route, connections and installation access in the same view. Share the proposed change with the project team.

Outputs

  • An issue marked in the model
  • An alternative-route review
  • A shared installation-review reference

An example of process-piping and installation-access review using GEMAK equipment.

View references ↗

Let’s review your model.

Process-area CAD, existing facility geometry and the pipe route to review.

Request a demo with your project →